1
/
of
6
ShopPamperedPets
WANWAYTECH GPS Pet Tracker Real Time Location For Dogs Cats
WANWAYTECH GPS Pet Tracker Real Time Location For Dogs Cats
Regular price
$181.99 USD
Regular price
$0.00 USD
Sale price
$181.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Track your pet in real time with a durable GPS tracker designed for dogs and cats.
- Real-time, worldwide location with TrackerOne: built-in IoT SIM, global coverage, your pet’s live location, and movement history via the app.
- Stay in control with geofence alerts and instant search: you’ll get leave-notifications, plus a 30-second bell-and-light search to locate them fast.
- Simple setup and long-lasting power: 800mAh battery delivers 30+ hours; pre-installed SIM; your device goes online within 5–10 minutes after GPS lock.
- Rugged, pet-friendly design: IP67 waterproof, 1.34 oz, silicone clip; magnetic charging; for pets over 4 kg; includes 1-year service with no monthly fee and optional renewal.
Share
